The Yanrey Uranium district to the north of Ggp licence
https://www.cauldronenergy.com.au/yanre ... m-project/
Search found 751 matches
- Tue Jan 23, 2024 8:02 am
- Forum: Applications and Roads
- Topic: Ashburton- Yannarie
- Replies: 2
- Views: 1192
- Sun Jan 21, 2024 10:07 pm
- Forum: Applications and Roads
- Topic: Ashburton
- Replies: 9
- Views: 3057
Re: Ashburton
Results announced from Dreadnought at Mangaroon
https://announcements.asx.com.au/asxpdf ... p75llx.pdf
High grade gold
https://announcements.asx.com.au/asxpdf ... p75llx.pdf
High grade gold
- Sat Jan 20, 2024 12:07 pm
- Forum: Havieron
- Topic: Evaporation Ponds
- Replies: 24
- Views: 6088
Re: Evaporation Ponds
Showing the large pond filling from the 2 right hand ponds over spilling but at a reduced rate than previously witnessed.
Still suggests to me the pressure has dropped.
- Thu Jan 18, 2024 2:42 pm
- Forum: GGPChat - The Main Forum
- Topic: I mean jeez it's just massive... 1bn tonnes?
- Replies: 16
- Views: 4217
Re: I mean jeez it's just massive... 1bn tonnes?
Hi MFU With what we have at the moment 15moz will come. With fan drilling all the way down 23moz will come in time. With most mines waste/dilution can take a % out of that the average is around 15%, at Havieron their quoting 6%. Also recovery factors are hanging around the high 80s for both copper a...
- Thu Jan 18, 2024 8:11 am
- Forum: GGPChat - The Main Forum
- Topic: I mean jeez it's just massive... 1bn tonnes?
- Replies: 16
- Views: 4217
Re: I mean jeez it's just massive... 1bn tonnes?
Hi Droverman Yes you did get carried away 🙂 If you look in my thread about the graphics I’ve posted the 0.5g/t shell this takes in about 50-60% of the breccia pipe, this relates to about 5-600m tons. The rest needs fan drilling to prove up, right at this minute it would probably be in a 0.1g/t shell...
- Wed Jan 17, 2024 10:47 pm
- Forum: Bromus
- Topic: Nickel target
- Replies: 22
- Views: 6017
Re: Nickel target
https://announcements.asx.com.au/asxpdf ... vrwrjv.pdf
Cullen resources drill results on Bromus south
Cullen resources drill results on Bromus south
- Wed Jan 17, 2024 9:54 pm
- Forum: GGPChat - The Main Forum
- Topic: I mean jeez it's just massive... 1bn tonnes?
- Replies: 16
- Views: 4217
Re: I mean jeez it's just massive... 1bn tonnes?
You don’t multiply tonnage x specific gravity that’s already been done.
You multiply cubic metre x specific gravity to give tonnage
You multiply cubic metre x specific gravity to give tonnage
Re: Graphics
IMG_6272.jpeg IMG_6271.jpeg IMG_6270.jpeg These 3 pics show the breccia Yellow = inferred Red = indicated Nb! There’s none in the Northern corridor These would have been updated in the new MRE The yellow with the original mine plan highlighting where 600,000 ton would have been lost to waste, hopef...
Re: Graphics
IMG_6268.jpeg IMG_6269.jpeg IMG_6267.jpeg Blue is ore above 0.5g/t Yellow was inferred in crescent some now converted into resources Green is 0.2 and is the gaps between the blue areas. These gaps are either low ore grade or areas not estimated due to lack of drilling Which is where fan drilling wi...
Re: Graphics
This is from the notes in the MRE RNS talking about crescent zone joining the Link and the Eastern breccia
Re: Graphics
IMG_6249.jpeg IMG_6250.jpeg IMG_6251.jpeg These are images of the sulphides with grades between 2-3g/t The brown colours are the attached breccia. The interesting bit is where the “tail” is heading, certainly looks like it’s going through the Link and Eastern Breccia’s and more than likely going on...
Re: Graphics
It’s tiny compared to the ore body.
The starter mine will pay for progressive infrastructure works going down.
- Thu Jan 11, 2024 9:03 pm
- Forum: GGPChat - The Main Forum
- Topic: Tailings Dams
- Replies: 56
- Views: 10544
- Thu Jan 11, 2024 9:01 pm
- Forum: GGPChat - The Main Forum
- Topic: Tailings Dams
- Replies: 56
- Views: 10544
Re: Tailings Dams
This is where the paste fill is coming from
- Thu Jan 11, 2024 8:48 pm
- Forum: GGPChat - The Main Forum
- Topic: Tailings Dams
- Replies: 56
- Views: 10544
Re: Tailings Dams
https://www.newcrest.com/sites/default/ ... 202021.pdf
The tailings dams Tsf7 57m high 208m cubic metres currently stored in 2021
Planned 250m cubic metres
The tailings dams Tsf7 57m high 208m cubic metres currently stored in 2021
Planned 250m cubic metres
- Thu Jan 11, 2024 8:44 pm
- Forum: GGPChat - The Main Forum
- Topic: Tailings Dams
- Replies: 56
- Views: 10544
- Tue Jan 09, 2024 9:48 pm
- Forum: GGPChat - The Main Forum
- Topic: Bamps posts
- Replies: 42
- Views: 11636
Re: Bamps posts
Bamps mate not Bamp
- Tue Jan 09, 2024 4:44 pm
- Forum: GGPChat - The Main Forum
- Topic: Bamps posts
- Replies: 42
- Views: 11636
- Tue Jan 09, 2024 4:43 pm
- Forum: GGPChat - The Main Forum
- Topic: Bamps posts
- Replies: 42
- Views: 11636
Re: Bamps posts
Sorry couldn’t resist
- Mon Jan 08, 2024 9:43 am
- Forum: Applications and Roads
- Topic: New licences
- Replies: 25
- Views: 7060
Re: New licences
SIPA joint venture with Rio latest drilling results between Winu and Ggp’s Citadel Hill.
Not successful this time.
https://wcsecure.weblink.com.au/pdf/SRI/02760560.pdf
Not successful this time.
https://wcsecure.weblink.com.au/pdf/SRI/02760560.pdf